Allegany Ballistics Laboratory
Northrop identifies ABL as a major tactical rocket-motor and missile-component manufacturing campus with a new missile integration facility.
Defense - Missile Systems
Orbit Space Technologies is a B priority account, led by a sourced capacity constraint signal.
Orbit Space Technologies reported a Q2 2026 double earnings beat with a record backlog, indicating strong demand exceeding current delivery capacity within the last 6 months. The Pentagon proposed a 188% increase in missile procurement funding, a specific funded sector expansion directly benefiting Horizon Aerospace & Defense's missile systems business.
Only locations with sourced operational evidence are shown. A corporate address alone is not treated as proof of manufacturing.
Northrop identifies ABL as a major tactical rocket-motor and missile-component manufacturing campus with a new missile integration facility.
The Elkton campus develops, manufactures, integrates, and tests advanced propulsion systems for missile, hypersonic, and space programs.
Northrop states that these sites manufacture and test solid rocket motors, cases, propellant, and related assemblies.
Orbit Space Technologies is currently B - Warm / Monitor. The strongest cited reason is: Orbit Space Technologies reported a Q2 2026 double earnings beat with a record backlog, indicating strong demand exceeding current delivery capacity within the last 6 months.
Biweekly signal refresh · scored July 2026
Orbit Space Technologies develops and manufactures advanced defense systems, missile components, propulsion, munitions, aerospace structures, and related mission technologies.
Apex Industrial supplied a known relationship path. This is first-party context and should be validated before outreach.
Access path: Start with Edgar Sandoval Flores to identify the right plant, program, operations leader, or sourcing owner.
Public profiles and email details require salesperson validation before outreach. Missing email fields may be supplied by Apex Industrial where available.
| Name | Role | Location | Relevance | Status / source | Rep Assistant | |
|---|---|---|---|---|---|---|
| Leslie Strong | Procurement Manager II | Salt Lake City Metropolitan Area, US | Procurement / supply chain | EmailNot publicly available | High LinkedIn post announcing current role · July 2026 · LinkedIn |
|
| Edgar Sandoval Flores | Known Apex Industrial relationship contact | Details pending Apex Industrial confirmation | Relationship path | EmailIdentity details required before lookup | High Supplied by Apex Industrial account team · Apex Industrial account team |
|
| Christy Szeliga | Senior Manager, Global Supply Chain Procurement, Defense Systems | Towson, Maryland, US | Procurement / supply chain | Emailchristy.szeliga@ngc.comProspeo verified · verify before sending | Medium Prospeo current-role match · August 2026 · LinkedIn profile via Prospeo |
|
| Keely Ragin | Global Supply Chain Strategy Director and Chief of Staff | Palmdale, California, US | Procurement / supply chain | Emailkeely.ragin@ngc.comProspeo verified · verify before sending | Medium Prospeo current-role match · August 2026 · LinkedIn profile via Prospeo |
|
| Shanil Modi | Director of Manufacturing Engineering | Lancaster, California, US | Operations / manufacturing | Emailshanil.modi@ngc.comProspeo verified · verify before sending | Medium Prospeo current-role match · August 2026 · LinkedIn profile via Prospeo |
|
Procurement Manager II
Known Apex Industrial relationship contact
Senior Manager, Global Supply Chain Procurement, Defense Systems
Global Supply Chain Strategy Director and Chief of Staff
Director of Manufacturing Engineering
Rationale: Orbit Space Technologies reported a Q2 2026 double earnings beat with a record backlog, indicating strong demand exceeding current delivery capacity within the last 6 months.
Next step: Use the cited event as a discovery opener. Confirm the affected program, facility, timing, and sourcing impact before presenting an Apex Industrial solution.
Rationale: Allegany Ballistics Laboratory has confirmed manufacturing evidence relevant to Apex Industrial's manufacturing-capability discussion.
Next step: Identify the plant leader and sourcing owner, then validate relevant part families, certifications, capacity needs, and supplier onboarding requirements.
Rationale: Apex Industrial supplied a known relationship path. This is first-party context and should be validated before outreach.
Next step: Start with Edgar Sandoval Flores to identify the right plant, program, operations leader, or sourcing owner.
Public signals, manufacturing locations, and contact candidates require salesperson validation before outreach. Location status labels distinguish confirmed manufacturing from planned or unconfirmed activity.
The priority score is a sequencing aid, not a sales forecast. Scored July 2026 from the frozen Phase 1 baseline; generated October 16, 2026. Biweekly signal refresh.